My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE56346
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE56346
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:58:56 PM
Creation date
11/20/2007 5:02:26 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980003
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
SECTION 2.05.4 RECLAMATION PLAN
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVED <br />REVIEW QUESTION ~ ;IUL 1 01981 <br />• 2.05,4 NED ~pNp <br />(2)(b) Revegetation costs; i.e., mulching, seem toc~ ~y~~~~"~T1OPilo°d~'e <br />substantiate or recalculate this figure. What are the assumptions f~~ ~F~ <br />15 percent figure for calculating administrative costs? The applicant <br />should supply estimates for removal of buildings. <br />RESPONSE <br />The reclamation costs were prepared for H-G Coal Company by a <br />qualified cost engineer. Production rates, equipment, excava- <br />tion quantities, and manpower requirements are summarized for <br />each reclamation task. H-G Coal Company believes that the costs <br />have been substantiated for each item and that no additional <br />calculations are necessary. (See copy of invoice supplied.) <br />Assumptions for the 15 percent administrative costs are based on <br />• the costs for general expenses, and overhead which include costs <br />for contracting, management, engineering, office supplies, and <br />administrative costs. The 15 percent figure is based on world- <br />wide experience. H-G Coal Company has calculated the removal of <br />facilities and associated structures. <br />This cost is presented under 2.05.4(b). It is the first cost <br />determined in the study. Facility removal costs are also given <br />in the summary of reclamation costs at the end of the study. <br />Reclamation cost for the tipple loadout area and railroad spur <br />are shown below: <br />Tipple/loadout Railroad Spur reclamation = $218,620 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.