Laserfiche WebLink
H-G Coal Company Reclamation Costs <br /> <br />The following summarizes reclamation costs at the Hayden Gulch <br />Mine. Amore detailed cost estimate has been deemed confidential. <br />ne Reclamatio <br />Facilities removal $ 42,920 <br />Backfill Pit 854,161 <br />Reduce Pit Slopes 224,740 <br />Topsoil Distribution 277,535 <br />Revegetation 132,421 <br />10% Administration Cost 153,178 <br />$1,684,955 <br />1 Loadout Reclamation <br />Facilities Removal $ 89,779 <br />Rail and Tie Removal 167,370 <br />Load, Haul and Dispose of RR Ballast 26,603 <br />Remove Fill - Return to Cats 128,293 <br />Replace Topsoil (RR) 20,854 <br />Revegetation (RR) 33,782 <br />Strip Facilities Pad 3,816 <br />Replace Topooil - Facilities Pad 4,695 <br />Revegetation (Pad) 14,224 <br />Subtotal $ 489,416 <br />10% Administrative Cost 48,942 <br />Bond for Hayden Gulch Loadout $ 538,358 <br />Bond for Mine $1,684,955 <br />Total Bond $2,223,313 <br />C~ <br />