Laserfiche WebLink
QUARTERLY POND INSPECTION REPORT <br />Bowie Resources LLC Quarter: Second 2006 <br />Bowie No. 2 Mine - C-96-083 Inspection Dale 6/22 & 29/2006 <br />Identification <br />of Pond <br />s During Inspection: <br />ximate Water Level <br />lent (% total storage) <br />~w (cfs) <br />Rills & Gulleys <br />Inadequate Vegetation <br />Outlet Channel Erosion <br />Burrows <br />Other <br />uctural <br />Differential Settling <br />Cracks or Slides <br />Seepage <br />Other <br />purtenant Structures <br />Defective Spillways <br />Dewatering Devices Clogged <br />Faulty Gales, Etc. <br />Other <br />Comments <br />aintenance Required: <br />ame of Inspector: Jim Stover <br />B C D -Gob Pile F -New Gob J UTL Easl K UTL West <br />Sediment Sediment Sediment Sediment Sediment Sediment <br />5' 0' 0' Dry Dry Dry/Damp <br />20% 0% 0 % 0% 0% 10% <br />0 0 0 0 0 0 <br /> <br />Problem Problem Problem Problem Problem Problem <br />Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No <br /> <br />No No No No No No <br />No No No No No No <br />No No No No No No <br />No No No No No No <br />No No No No No No <br />No No <br />No No <br />No No <br />No No <br /> <br />No No <br />No No <br />No No <br />No No <br />No No <br />No No <br /> <br />No No <br />No No <br />No No <br />No No <br />No No <br /> <br />No No <br />No No <br />No No <br />No No <br />The sediment in Ponds C & D & F had been cleaned prior to the inspections. <br />Design depth measured from pond bottom to invert of emergency spillway: <br />Pond 8=10, C=10, D=7.7, J=6, K=4, F=10' TD <br />Pond Bottom Elevations 6=5942, C=5990, D=5972, F=5944, J=5852, K=5819 <br />Mud Pils -GVB B2D - OK-Dry, GVB 6B needs rework to be incised, GVB~~~~® pit - OK. <br />The sediment from Pond B was being removed during the June 29thdds~ti~ ~ / f j~ O <br />e..e• <br />~1pF . S E. STS. 'Pfoa <br />tax v, a <br />• U i Q e <br />~ E. St e ~ ~ <br />~~ <br />• CeJorado P. E. 192300 <br />