Laserfiche WebLink
,~ iiiiuiiiiiiiiuiii <br />lv:;~ls=~ LAr+D ~'sECLAMATION DIVISION <br />Department of Natural Resources <br />1313 Sherman SI.. Room 215 <br />Denver. CC 90203 <br />303 866-3567 <br />FA X. 303 832-0106 <br />STAT ~OF <br />'i ,~ 3~_1iJlJ <br />~~[. ~ ^Y <br />tiT ;.~:u y!~ Q <br />\C <br />/87 <br />Poy Fomer, <br />Governor <br />Michael B. Long, <br />Division Director <br />May 1, 1992 <br />Mr. George Gregg <br />Valco-Gunnison Concrete Division <br />P.0. Box 83J <br />Gunnison, CO 81230 <br />Re: Gunnison Ready Mix Pit (Permit M-77-023) Topsoil Stabilization Plan <br />Requested in Division 03/12/92 Inspection Report <br />Dear Mr. Gregg: <br />The Division has received your letter dated April 27, 1992 containing the <br />above-referenced plan. The items indicated in your plan appear quite <br />acceptable; however, some grading of the northwest topsoil stockpile may be <br />necessary in order that the vegetation take hold. As I recall, there were <br />some pretty sheer faces on that pile. <br />As regards Item 3 on the inspection report, the Division appreciates your <br />prompt attention to that concern and hopes that you may be able to submit the <br />suggested amendment by June 10, 1992. <br />Sincerely, <br /> <br />James C. Stevens <br />Senior Reclamation Specialist <br />JCS/bjw <br />2851E <br />