Laserfiche WebLink
r <br />EXHIBIT 19 <br />MR~ RAW COAL RECLAIM TUNNEL EXTENSION <br /> <br /> <br />Structure Removal <br />1. Ventilation/Escape Tunnel extension <br />Concrete <br />1x9x200 1800 sq.ft. <br />1800 aq.ft. ~ S2.12/sq. ft.= <br />Cover <br />12 Dia. Multi-Plate Culvezt <br />200' i 55.00/ft . <br />Subtotal <br />2. Backfilling and Grading <br />Excavating Borrow <br />1,000 CY • $0.84 <br />Backfilling 300' haul common earth <br />1,000 CY • $2.13 <br />Grading <br />1 day i $552 <br />Subtotal <br />3. Revegetation <br />Surface is previously disturbed and bonded <br />for spreading subsoil, topsoil and reseeding. <br />TOTAL BOND REQUIRED <br />53,816 <br />51,000 <br />$4,816 <br />$ 840 <br />$2,130 <br />S 552 <br />$3,522 <br />$8,338 <br /> <br />