Laserfiche WebLink
<br />EXHIBIT 19 <br />• <br />BONDING SCHEDULE - TECHNICAL <br />RE <br />V <br />ISI <br />ON 30 <br />3-North intake Fan {~.p ~.ZQ /l~-q II,A <br />/ <br />~ <br />f` <br />UT Y~ S ~'~A~7 j <br />1. Removal of Equipment <br />A. Dismantal Fan, Motor, and Ducting <br />Electrical 8 Hours at $27.00/Hr $ 216 <br />Mechanical 32 Hours at $24.00/Hr 768 <br />Labor 4 x 32 Hours at $16.00/Hr 2,048 <br />Crane Rental 4 Days at $500/Day 2,000 <br />B. Building Removal <br />10' x 20' x 10' = 74C.Y. x $7.65 566 <br />2. Removal of Concrete Foundations <br />Footers 2' X 3' X 120' at $18.20/ L.F. 2,184 <br />Concrete Slab 200 ft.2 at $2.90/S.F. 580 <br />3. Grading and Seeding 0 <br />(Area is already bonded for grading, seeding, <br />and revegetation-No increase in acreage) <br />Mains West Intake Shaft l2b ~ ~~~ p ~ ~ ~~~ Z <br />1. Removal of Equipment <br />A. Dismantal Fan, Motor, and Ducting <br />Electrical 8 Hours at $27.00/Hr $ 216 <br />Mechanical 32 Hours at $24.00/Hr 768 <br />Labor 4 x 32 Hours at $16.00/Hr 2,048 <br />Crane Rental 4 Days at $500/Day 2,000 <br />B. Building Removal <br />10' x 20' x 10' = 74C.Y. x $7.65 566 <br />2. Removal of Concrete Foundations <br />Footers 2' X 3' X 120' at $18.20/ L.F. 2,184 <br />Concrete Slab 200 ft.2 at $2.90/S.F. 580 <br />3. Grading and Seeding 0 <br />(Area is already bonded for grading, seeding, <br />and revegetation-No increase in acreage) <br />SUBTOTAL $16,724 <br />Contract Administration @208 3,345 <br />PROJECT TOTAL $20,069 <br />n <br />U <br />