Laserfiche WebLink
<br />x location and Summa <br />ipl~ ~ ~hibit 19 (Continued) <br />d) Haul water: 9 trips x 550./trip..$ 450. <br />e) Marker: 10 markers x. $12........ $ 120. <br />Labor: 1 man x 515./hr x 20 hrs..S 300. <br />Cement:20 sacks x $7./sack.......$ 140. <br />f) Water cost:525./load x 9 loads...S 225. <br />Total Cost: (a + b + c + d + e + f) ................5 12,399. <br />6. Cut and Fill <br />Common earth, minimal haul distance <br />2,333 total yards x 50.75/yd ........................5 1,750. <br />7. Mobilization and Demobilization: <br />a) Drill rig and associated equipment..$ 1,000. <br />b) Dozer and grader ....................5 300. <br />c) Move from site to site ..............5 2,000. <br />• Total Cost: (a + b + c) ............................5 2,500. <br />8. Contingency for State Agency Oversight Expenses.....5 2,000. <br />T <br />TOTAL ESTIMATED BONDING REQUIREMENT :....................$ 29,100. <br /> <br />