Laserfiche WebLink
<br />EXHIBIT 19 <br />BONDING SCHEDULE f~'IR-57 <br />Minor Revision for Modification to Bulk Emulsion Oil <br />1. Bulk Storage Tank Removal <br />$ 250. <br />2. Concrete containment Basin 1,500. <br />5 cubic yards @ $300/yd.3 <br />3. Backfilling and Grading 0. <br />None required. <br />4. Revegetation 0 <br />Surface is previously disturbed and <br />bonded for spreading subsoil, topsoil, <br />and reseeding. <br />• None required. <br />TOTAL $1,750 <br /> <br />