Laserfiche WebLink
EXHIBIT 19 <br />GOLDEN EAGLE MINE RECLAMATION COST BREAKDO[+1N <br />Buildings/ Construction Total Cost/ Total <br />Facilities 1r a Length Width Floors Area .Ft. Cost S <br />Exhaust Shaft b Fan 5 75 35 1 2,645 2.12 5,565 <br />Water Tank 4 25 25 1 625 3.13 1,956 <br />Intake Shaft b Esc. 4 20 40 1 800 4.38 3,504 <br />44KV Substation 6 60 28 1 1,680 1.97 3,310 <br />Employee Walkway 5 35 8 1 280 2.19 613 <br />Industrial Building 5 250 40 1 10,000 1.80 18,000 <br />Shop 5 145 45 1 6,SZ5 1.80 11,745 <br />Slope Belt 4 440 8 1 3,520 1.80 6,336 <br />Reload Hopper 4 25 25 1 625 1.80 1,125 <br />Trestle 4 140 10 1 1,400 1.80 2,520 <br />Plant Substation 6 40 30 1 1,200 1.80 2,160 <br />Warehouse 5 85 30 1 2,550 1.80 4,598 <br />Hoist House 5 50 35 1 1,750 1.80 3,158 <br />2000T Coal Silo 4 40 40 1 1,600 1.80 2,880 <br />Breaker Belt 4 80 8 1 640 1.80 1,152 <br />Breaker Building 4 55 35 2 3,850 1.80 6,930 <br />Tipple Belt 4 50 8 1 400 1.80 720 <br />(pple Building 4 35 18 2 1,260 1.80 2,268 <br />,swage Treat Plant 6 30 30 1 900 1.80 1,620 <br />• <br />Oil Tank 4 20 8 1 160 1.80 288 <br />Pump House 5 I2 I2 I 144 1.80 259 <br />Slope Entry (A) See Attached Calculations 10,100 <br />Rail Track Removal (g) 91,000 <br />Shaft Collar and Seals (C) 10,000 <br />Concrete Floors b Footers (D) 40,000 <br />Major Grading (E) 117,000 <br />Soil Loosening b Fine Grading (F) 26,400 <br />Topsoil Placement (G) 12,000 <br />Fertilizer, Seed, Mulch (H) 41,275 <br />Five-Year Maintenance (I) 112,000 <br />4' Cover on Refuse Pile (J) 9,534 <br />TOTAL BOND $550,000 <br />