Laserfiche WebLink
QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />CDMR Rule 4.05.9(17) <br />Mine: New Elk <br />NPDES ID. No.: Pond #7 <br />Inspection Period; First Quarter 2004 <br />Inspection Date: 01/16/04 <br />General D~esy~~cjription or Reference to Site Plan: ~js p c~~%~c/c/Q //es East ~~ <br />EMBANKMENT <br />1). Adequacy of the vegetative cover: <br />2). Erosion forming Gullies: <br />3). Is wave action causing erosion: <br />On the Upstream embankment? <br />At the principal spillway inlet? <br />Excellent Moderate ew Poor <br />Extensive Some ew None <br />Yes <br />Yes <br />4). Erosion of the downstream toe of the embankment? Yes <br />Cause of erosion can be attributed to: <br />No ~ <br />No c~ <br />No <br />5). Is seepage occurring through the dam? Yes <br />Could this seepage cause potential instability? <br />No /~~ <br />PRINCIPAL SPILLWAY <br />1). Is the principal spillway system in working order? <br />2). Is the inlet free of debris and restrictive material? <br />3). Is the discharge outlet free of restrictive material? <br />4). Is erosion occurring at the discharge outlet? <br />Evaluate the severity: Extensive Moderate <br />Yes ~ No <br />Yes (~ No <br />Yes (_~ No <br />Yes No ~- <br />Just starting None <br />Page 1 of 2 <br />