Laserfiche WebLink
QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />CDMR Rule 4.05.9(17) <br />Mine: New Elk <br />NPDES ID. No.: None O~vp <br />Inspection Period: First Quarter 2004 <br />Inspection Date: 01/16/04 <br />General Description or Reference to Site Plan: <br />Re.cew~s o/er_ F~,.-~, fro>->Z Peep P~m~ - !~/f/n~is /Io~/r/s'erurce, <br />DuS~-~ Srsv/c.~- <br />EMBANKMENT <br />1). Adequacy of the vegetative cover: Excellent Moderate Few Poor <br />2). Erosion forming Gullies: <br />3). Is wave action causing erosion: <br />On the Upstream embankment? <br />Yes <br />4). Erosion of the downstream toe of the embankment? Yes <br />Cause of erosion can be attributed to: <br />No <br />No <br />5). Is seepage occurring through the dam? Yes <br />Could this seepage cause potential instability? <br />SEDIMENT STORAGE CAPACITY <br />No <br />1). Has the design storage capacity of the reservoir been surpassed? <br />Yes No <br />Explain: <br />OTHER OBSERVATIONS: <br />ro ~~ <br />~~~ <br />MSHA Qualified Impoundment Inspector <br />~ //~~ y <br />Dates-T <br />Extensive Some Few None <br />Page 1 of 2 <br />