Laserfiche WebLink
<br />Richar0 D. Lamm <br />Governor <br />ii iiiiiiiiiiiii iii <br />DEPARTMENT OF NATURAL RESOURCES <br />Davin H. Getches. Executive Director <br />MINED LAND RECLAMATION DIVISION <br />DAVID C. SHEL70 N, Director <br />February 27, 1986 <br />Mr. Scott Jones <br />Snowmass Coal Company <br />P.O. Box 980 <br />Carbondale, Colorado 81623 <br />Re: Technical Revision for reduction of monitoring; File No. C-81-025 <br />Dear Mr. Jones: <br />After review of the previous year's monitoring results from the North Thompson <br />Creek Mines, the Division proposes the following monitoring schedule to be in <br />effect both during the present condition of temporary cessation and when the <br />mine begins production activity again. There are two exceptions to this <br />schedule as detailed below: <br />• 1. The requirement for monitoring of the Roaring Fork is deleted and does <br />not need to be monitored if production activity is started. <br />2. If sealing and/or flooding of either Mine No. 1 or ? is instigated Wells <br />No. 1, 3 and 4 should be monitored on a monthly basis for levels and <br />Table 1B parameters. <br />The enclosed tables depict the Division's proposed monitoring plan. If <br />Snowmass agrees, please respond so in writing as soon as possible so the <br />approval letter can be issued. <br />Sincerely, <br />.~~ ~ . " <br />,,/~ <br />4 i"`~ <br />Candace M. Thompson <br />Hydrologist <br />CMT/vjr <br />7935E <br />~J <br />423 Centennial Building, 1313 Sherman Street Denver, Colorado 80203 Tel. (303) 866-3567 <br />