Laserfiche WebLink
Gingery Associates, /nc. <br />• 1310 UTE AVENUE ' <br />:~ ;1 •, GRAND JUNCTION, <br />~- > ~ COLORADO 81501 <br />TELEPHONE 303 245 0627 <br />LL , <br />/ <br />C•~ <br />~~' , <br />..---~~ <br />~~ <br />~II'I~II~II~II~~ II~ <br />tARRYLA MULLFR <br />FIOYO F. MONTGOMERY <br />JONN W. CASKfY <br />DOUGCASC STOVALL <br />7840 SOU 1H VAL L EJO STREET <br />ENGLfwOOD, COLORA0080110 <br />TELEPHONE 303761 d860 <br />October 1, 1980 <br />~~~~I~~~ <br />Mr. Bob Weaver ~, <br />Macar Mining Corporation I ~ ~ . , ~~ O C T - ~ 198 <br />117 South 8th Street <br />Gunnison, Colorado 81230 ,~C t <br />MINED LAND RECL.pIJ~P.T'RN <br />Re: O. C. Coal Mine No. 2 Colo. Dept. of NdtWa~ nesuurCes <br />Job No. 1979.601 <br />Dear Mr. Weaver: <br />This letter is to certify that on September 25, 1980, I visited the <br />Ohio Creek D1ine No. 2 site to review the progress of cca~.struction on the <br />mine sedimentation pond and ditches and to determine general crortplianoe <br />with the pond design as done by our firm. <br />At the time of mr~+ visit, pond construction was about 90$ complete. <br />The emergency spillway must be completed ~'1.topsoil spread over the em- <br />b,t. Riprap should be peas of~.ne aiVersion t s. <br />Please see closed site plan for an as-built location of the <br />nt •on and ditches. This drawing was prepared from infornra- <br />~rovi by a field survey conducted on September 25, 1980. <br />If we can be of further assistance, please call our office at any <br />tiTre. <br />,f(t ~,__/ ,.., 9L. .[e. .ate°~.:~ccP~ M _,.rd/~~ <br />RRF/dd <br />Very truly yours, <br />,~GINGER??Y ASSOCIATES, INC. <br />~~ J <br />Ronald R. Fromilcnecht, P.E. <br />Project Manager <br />cc: Mined Land Reclamation Board, Attn: Mr. Pete Evans / <br />CIVIL ENGINEERING/INDUSTRIAL & MINE FACILITIES/LAND SUR VEVING/STORM DRAINAGE/ST RUCTUR ALNJ ATER & SANITA PION <br /> <br />