Laserfiche WebLink
<br />18. 7?low mnsuremeat: WFut method of Oow measurement will be uacd for each discharge point. (e.g., v notch weir, pump upecity, panhnll <br />^ume, ae.)T Duignate whether eurrrntly installed or proposed. Identify Ute minunum and maximum flow musurement upnbdrty. List the <br />last daft calibrated. <br />A continuous chart recorder for Pond 001, and a totalizer for Pond 007. <br />Other nonds.;.if and when dischar);in>;, will be measured liy "bucket and <br />stopwatch". <br />19. Impro~tmmts: Please provide a ductiption of any abatanrnt requirement, abatement projca and projected Grin compliance data if subject <br />to any prearnt roquirements or compliance achedulca for coruwcLOn, upgrading or operauen of wute trrwvncnt equipment. List any <br />changu Gem previoua permit. <br />20. Is or will land spplication of any wastewater be practiccdi No ^ Yu © If u, Icase provide a copy o(thc material <br />submitted to the Division of Minen4 and Geology on the discharge and include a copy of the DMG spprvvnl where applicable. Briefly <br />ducribe the procua: <br />~,,.,.1 nn7 warm ;s aced for dust control. DMG permit is a bulky document. It is <br />not practical to submit a copy of the same. CDH should confirm this with DMG. <br /> <br />Coal Mmoy App. 9197 <br />