Laserfiche WebLink
EST INAT ING FORM - REVEGETAT ION YORK cont'd Filename M060-3 sheet 2 of 2 <br />B. SHRUB 8 TREE TRANSPLANTS <br />____________________________ ~ ~ MATERIAL: PLANTING: ~ f/PERT. ~ TOTAL ~ TOTAL <br />SPECIES NAME ~ GUAN./ACRE ~ STOCK TYPE 8 S[2E ~ S/PLANT I f/PLANT ~ PELLET ~ S/PLANT ~ f/ACRE <br /> <br />No transplants required ~ ~ ~ ~ ~ ~ (0.00 <br /> Total transplant cost/acre: (0.00 <br />C. SEEDBED PREPARATION <br />_______________________ =___________ <br />_______________________ <br />Tilling method #1: disc harrowing •* <br />f96.80 <br />k2: <br />D. SEED APPLICATION <br />Seeding method: dri LL seeding <br />Total cost/acre: 596.80 <br />____________ <br />Total cost/acre: f60.23 <br />E. PERT ILI2INC <br />_______________ FERTI LI2ER / SOIL AMENDMENT I UNITS/ACRE I UNIT ~ S/UNIT ~ S/ACRE <br />Materials used #1: b-24-24, 70-20-10, 15-15-15 • ~ 285.00 ~ gourd ~ f0.16 ~ 545.60 <br />#2: <br />#3: <br /> Total materials cost/acre: (45.60 <br />Application method k7: tractor drawn broadcast spreader •• 520.97 <br />#2: <br /> Total application cost/acre: (20.91 <br />F. MULCHING =___________ <br /> NULCH / NETTING / OTHER MATERIALS ~ UNITS/ACRE I UNIT ~ f/UNIT ~ f/ACRE <br />Materials used k7: strew (delivered) - ton • ~ 2.00 ~ ton ~ (75.28 ~ 5)50.56 <br />k2: <br />#3: ~ ~ ~ ~ <br />#4: <br /> <br /> Total materials cost/acre: f)50.56 <br />Application method #1: power mulcher (hay spr. 1" deep) •' 560.11 <br />#2: crimping (with tractor) • 547.47 <br />#3: <br />G. JO8 COST <br />Total area to be seeded: <br />Estimated failure rate: <br />40.00 acres. Total f/acre <br />35.OOX of area. Total S/ecre• <br />• Reseeding cost items: A C D E F <br />Total application cost/acre: (101.52 <br />5498.88 Total Initial Job Cost= 519,955.29 <br />_ ____________ <br />(498.88 Total Reseeding Costs = (6,984.35 <br />GRAND TOTAL JOB COST = 526,939.64 <br />