Laserfiche WebLink
erosion downstream from the mine plan area in order for the <br />intermittent streams draining the mine plan area to regain the <br />natural level of sediment load. The sediment control measures taken <br />to comply with quality regulations already applicable to water <br />discharge from Kerr coal's operations and the effluent limi- <br />r~ <br />U <br />a~ 780-124Ra Revised - September 1993 <br />