Laserfiche WebLink
Frank C Healy <br />January 4, 2006 <br />Page 3 <br />8. The approval of this substitute water supply plan does not relieve the applicant of the <br />requirement to obtain a Water Court approved permanent plan for augmentation to ensure <br />the permanent replacement of all depletions, including long-term evaporation losses after <br />the gravel mining operations have ceased. Application for an augmentation plan should be <br />made three years prior to the completion of mining with the intent of obtaining a decreed <br />plan by the wmpletion of mining. Approval of this substitute supply plan does not imply a <br />position by this office on any related litigation. <br />9. Any request for renewal of this plan must include new or additional long-term supplies of <br />water sufficient to cover the evaporative depletions from the pit. <br />10. Should a request for renewal of this plan be needed, such renewal request must be <br />submitted to this office at least 45 days prior to the expiration date of this plan (February 15, <br />2006). <br />11. This plan may be revoked or modified at any time should it be determined that injury to other <br />vested water rights has or will occur as a result of the operation of this plan. <br />12. Should this substitute water supply plan expire without renewal or be revoked prior to <br />adjudication of a permanent plan for augmentation, all mining of wet product must cease <br />immediately. <br />13. In accordance with amendments to Section 25-8-202-(7), C.R.S. and "Senate Bill 89-181 <br />Rules and Regulations" adopted on February 4, 1992, the State Engineer shall determine <br />whether or not the substitute supply is of a quality to meet requirements of use to senior <br />appropriators. As such, water quality data or analysis may be requested at any time to <br />determine if the water quality is appropriate for downstream water users. <br />14. Acceptance of these conditions shall be assumed unless a letter to the contrary is received <br />by this office, the Division Engineer (310 E. Abriendo, Suite B, Pueblo CO 81004), and the <br />Water Commissioner (Don Taylor, P.O. Box 321, Swink, CO 81077) within two weeks of <br />your receipt of this letter. <br />Should you have any questions, please contact Heidi Frey of this office or Kalsoum <br />Abbasi, in our Division 2 office in Pueblo at (719) 542-3368. <br />~V v <br />ck Wolfe, P.E. <br />Assistant State Engineer <br />cc: Steven J. Witte, Division Engineer <br />Don Taylor, Water Commissioner <br />Division of Minerals and Geology <br />DW/HCF:word/thomeczek pit <br />