My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO24601
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO24601
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:44:37 PM
Creation date
11/20/2007 4:50:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981013
IBM Index Class Name
Hydrology
Doc Date
4/13/1992
Doc Name
1ST QTR 1992 IMPOUNDMENT REPORTS
From
WYOMING FUEL CO
To
MLRD
Permit Index Doc Type
SEDIMENT POND INSPECTIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WYOMING FUEL COMPANY <br />/' SEDIMENT POND INSPECTION FORK <br />I /~ <br />Pond jq ~ Xo NPDES No•_ ~O ~_ <br />Date of Inspection ~ ~ 6 - 9 z-- _ _ _ <br />• EMBANKMENT <br />1. Evaluate the adequacy of the vegetative corer llent, oderate, Spotty, Poor. <br />2. Are erosion-formed gullies present? E:ctensire, rne, y Few, None. <br />3. Is wave action causing erosion: On the upstream embankment? Yes~_ No ~~ <br />At the principal spillway inkt? Yes No y~ , <br />- - 4. Is the downstream toe of the embankment being eroded? Yes No_~ <br />-_ ___- cause of erosion is attributed to: Explain <br />5. !s seepage occvring through the dam? Yes No if yes could this seepage <br />~- - ~ --potentially-cause slope instability? Yes-- Ne- - --FsVkir~- ----- _. <br />PRINCIPAL SPILLWAY <br />- =1. -- - Is the overall principal spillway system in good wakinj order? .Yes~</ No =_ _ <br />~t 2. Is the inlet free of debris a other restrictive materials? Yes =/ No__ <br />3. is the discharge outlet free of debris err other restrictive mate~ial~s? Yes y!'1~ <br />4. is erosion occurring at the discharge outlet? Yes No ~ if yes; evaluate the <br />severity: Extensive, Moderate, Just Starting, None _ <br />EMERGENCY SPILLWAY <br />1. Is the overall emer~genc~y pillway system currently capabk of passim design storm <br />_.. _ discharge? Yes // No _ - <br />2. Does it appear as if the emergent illvay has diachar=ed eater sittee tfie last <br />inspection? Yes No ~~ <br />3. Is erosion occurring at any section of the emergency spillway? Yes No !~~ <br />Describe extent and loCa 'on:~~i~n,e ~.A_wa.C~ t~~_ <br />~~s ~GSL_ ~• <br />SEDIMENT STORAGE CAPACITY ~ _ <br />1. Has the design sediment storage capacity of the reservoir been surpassed? Yes ,~y <br />No yes, explain i. /.,fib ~~,.,.Q Iov,Q~ / %~ ~-- ~4k~~1'•`~t<N ~oc~16'"/ <br />Please add any special comments concerning potentially dangerous problems on the back <br />I of this sheet. %~,,_ / C~ <br />Inspector-~~=~` cv(~ ---'~- <br />-~_ - - <br />
The URL can be used to link to this page
Your browser does not support the video tag.