Laserfiche WebLink
Inspection CategorX <br />1 <br />10&11 <br /> <br />Comments <br />The as-built survey has not been completed. <br />This is a new pond, dam is finished, but spillway still needs more <br />work per the desi¢rt of SIIPM-6. <br />The pond is full of water, severe erosion at the outlet, bo[h inlet <br />and outlet channels need riprap. <br />SKETCH <br />I~ <br />