Laserfiche WebLink
Inspection Categ~ty Comments <br />Freeboard will be determined from as-built drawing, pond has four <br />1&10&11 feet of water in it. <br />L!I <br />Minimal amount of silt, pond functioning well. <br />Spillway is okay per design of SIIPM-11. Revegetated with <br />seedlings and seed. <br />SKETCH <br />iu <br />