My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE55912
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE55912
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:58:36 PM
Creation date
11/20/2007 4:49:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084A
IBM Index Class Name
Permit File
Doc Date
1/11/2005
Section_Exhibit Name
Exhibit 23 Bond Calculations
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br /> <br />PROJECT IDENTIFICATION <br /> Agency or organization name :Colorado Division Of Minerals And Geology <br />Task # : 034 State :Colorado Permit/job # : C-98-084 <br />Date: 12/152004 County :Las Animas Abbreviation :none <br />User: JRS Site :Lorencito Canyon Mine Filename :C084-034 <br />Permit or other job action :Current Permitted Estimate <br />Task description :Replace Topsoil from Stockpile BA1X? to W-3 <br />HOURLY EQUIPMENT COST <br />Trucklloader team -Truck :Cet 773D . <br />-Loader :CAT 990 Series ll <br />Support equipment -Load area :Cat D9R - 9SU <br />-Dump area :Cat D9R - 9SU <br />Road maintenance -Motor grader :CAT 14H <br />-Water truck :Water Tanker, 5,000 Gal. <br />Shift basis : 1 per day <br />Cost Breakdown : rucklLoader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : lruck2 loader dozer dozer grader misctruk <br />Utilization-machine : 100 85 50 100 25 25 <br />-Ripper attachment : NA NA 50 0 NA NA <br />Ownership wsf/hour: $58.05 $77.61 $51.01 $51.01 $34.94 $22.35 <br />Operating cost/hour: $74.86 $80.30 $46.77 $93.54 $10.60 $9.18 <br />Ripper op. cost hour : NA NA $4.51 $0.00 $0.00 NA <br />Operator cost/hour: $21.80 $31.95 $31.76 $31.76 $31.95 $21.16 <br />Unit subtotals: $154.71 $189.85 $134.05 $176.31 $77.49 $52.69 <br />Number of units : 2 1 1 1 1 1 <br />Group subtotals: Work: $499.28 Support: $310.36 Maintenance: $130.18 <br />Total work team cosUhour : $939.82 <br />,: <br />...... , .. ;; ~: ';. ~, ::: a '.'. ~, ;. .:i ;: <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 1,830 CCY factor: 1.125 volume : 2.059 LCY <br />Material weighU 2,550 pounds/LCY Struck volume: 34.80 LCY <br />Descr.:Earth-dry packed Heaped volume: 46.40 LCY <br />Rated payload : 108,060 pounds Average volume : 40.60 LCY <br />Payload capacity : 42.38 LCY Adjusted volumes: 42.38 LCY <br /> Final track volume based on number of loader passes : 39.38 LCY <br /> • Wck volume adjuneE m not exceeE rated payl°aC «Mapetl vdunn <br />Loadlna Tool Caoacity <br />Rated capacity (nom. heaped) : f 1.250 LCY <br />Descr.:Loose matedal - 1"and over (85 - 90% <br />Bucket fill factor: 0.875 <br />Adjusted bucket capacity : 9.843 LCY <br />~ectlons : Site altitude (it.) <br />Truck ~ Loader <br />Job efficiency :~ 0.830 ~ 0.830 <br />Nel correction : 0.830 0.830 <br />Z3-~1~ <br />100 <br />• <br />• <br />C J <br />
The URL can be used to link to this page
Your browser does not support the video tag.