My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE55912
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE55912
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:58:36 PM
Creation date
11/20/2007 4:49:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084A
IBM Index Class Name
Permit File
Doc Date
1/11/2005
Section_Exhibit Name
Exhibit 23 Bond Calculations
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sheet t of 2 <br />CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Agency or organization name :Colorado Division O1 Minerals And Geology <br />Task # : 032 State :Colorado PermiUjob # : C-96-084 <br />Date: 12/15r2004 County gas Animas Abbreviation :none <br />User : JRS Site : Lorencito Canyon Mine Filename : C084-032 <br />Permit or otherjob action :Current Permitted Estimate _ <br />Task description :Replace Topsoil from Stockpile BAfR? to S-4 <br />.., ;::. <br />HOURLY EQUIPMENT COST Shift basis : 1 per day <br />Truck/loader team -Truck :Cat 7730 ' <br />-Loader :CAT 990 Sedes N <br />Support equipment -Load area :Cat D9R - 9SU <br />-Dump area :Cat D9R - 9SU <br />tad maintenance -Motor grader :CAT f4H <br />-Water truck :Water Tertker. 5.0 <br />Cost Breakdown : Truck/LOader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Durnp Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Impon data filename : iruck2 loader dozer dozer grader misctmk <br />°/a Utilization-machine : 99 100 50 100 25 25 <br />-Ripper attachment : NA NA 50 0 NA NA <br />Ownership cosVhour: $58.05 $77.6f $51.01 $5f.01 $34.94 $22.35 <br />Operating cosUhour: $74.77 $94.87 $46.77 $93.54 $10.60 $9.18 <br />Ripper op. cosUhour : NA NA $4.51 $0.00 $0.00 NA <br />Operator cosUhour : $21.80 $31.95 $31.76 $31.76 $31.95 $21.16 <br />Unit subtotals : $154.62 $204.42 $134.05 5176.31 $77.49 $52.69 <br />Number of units : 3 1 1 1 1 1 <br />Group subtotals: Work: $668.29 Support: $310.36 Maintenance: $130.18 <br />Total work team cosUhour : $1.108.83 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 2,370 CCY factor: 1.125 volume: 2,666 LCY <br />• <br />• <br />Material weight : 2,550 pounds/LCY Struck volume: _ _ 34.80 LCY <br />Descr.: EaRh -dry packed Heaped volume : 46.40 LCY <br />Rated Dayload : 108,060 pounds Average volume :_ 40.60 _LCY <br />Payload capacity : 42.38 LCY Adjusted volume`: 42.38 LCY <br /> Final truck volume based on number of loader passes : 39.38 LCY <br /> ' imck vohxne adjustatl to not eacee6 raletl payloaC m heapatl voNma <br />Loading Tool Caoaclty <br />Rated capacity (nom. heaped) : 11.250 LCY <br />Descr.: Loose material - 1 "and over (85 - 90% <br />Bucket fill factor : 0.875 <br />Adjusted bucket capacity : 9.843 LCY <br />rections : Site altitude (ft.) : 7,100 <br />Truck Loader Source , • <br />1.000 1.000 fCat HB) <br />Net correction : 0.830 <br />0.830 <br />Z~3 - 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.