My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE55912
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE55912
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:58:36 PM
Creation date
11/20/2007 4:49:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084A
IBM Index Class Name
Permit File
Doc Date
1/11/2005
Section_Exhibit Name
Exhibit 23 Bond Calculations
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sheet t of 2 <br />CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br />Task # <br />Dale <br />User <br />Agency or organization name :Colorado Division O(Minerals And Geology <br />031 State :Colorado PermiUjob#:C-96-084 <br />12/152004 County :Las Animas Abbreviation :none <br />JRS Site : Lomncito Canyon Mine Filename : 0084-031 <br />Permit or other job action :Current Permitted Estimate <br />Task description :Replace Topsoil from Stockpile BA#2 [o S-2 <br />,> ,; <br />HOURLY EQUIPMENT COST Shift basis : ~ 1 per day <br />TrucWloader team -Truck <br />-Loader <br />Support equipment -Load area <br />-Dump area <br />Road maintenance -Motor grader <br />-Water truck <br />773D <br />1-990 Series ll <br />D9R-9SU <br />D9R-9SU <br />T 14H <br />ter Tanker. 5.000 Gal. <br />Cost Breakdown : ruck/Loader Work Team <br />Tmck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 loader dozer dozer grader misctmk <br />Utilization-machine : 92 100 50 100 25 25 <br />-Ripper attachment: NA NA 50 0 NA NA <br />Ownership cosUhour : $58.05 $7761 $51.01 $51.01 $34.94 $22.35 <br />Operating cosUhour: $69.23 $94.87 $46.77 $93.54 $10.60 $9.18 <br />Ripper op. cosUhour : NA NA $4.51 $0.00 $0.00 NA <br />Operator cosVhour: $21.80 $31.95 $31.76 $31.76 $31.95 $21.16 <br />Unit subtotals : $149.08 $204.42 $134.05 $176.31 $77.49 $52.69 <br />Number of units : 5 1 1 1 1 1 <br />Group subtotals : Work : $949.83 Support : $310.36 Maintenance : $130.18 <br />Total work team cosVhour : $1,390.37 <br />:: .. ...... .:c ..::~ ....... <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 970 CCY factor: r rj5 volume: 1,091 LCY <br />weight: 2,550 pounds/LCY <br />Descr.: Earth -dry packed Heaped volume <br />Rated payload : 108,060 pounds Average volume <br />Payload capacity : 42.38 LCY Adjusted volume`: <br />Final truck volume based on number of loader passes <br />' Wck volume atljustetl to not eacaetl raletl payloatl w heapetl volume <br />Loading Tool Caoacitv <br />Rated capacity (nom. heaped) : 11.250 LCY <br />Descr.: Loose material - 1"and over (85 - 90% <br />Adjusted bucket capacity : 9.843 LCY <br />34.80 LCY <br />46.40 LCY <br />40.60 LCY <br />42.38 LCY <br />39.38 LCY <br />J <br />• <br />lob Condition Corrections : Si!e altitude (k.) : 7,100 <br /> Truck Loader Source <br />Altitude adj.: 1.000 1.000 (Cet HB) <br /> <br />Job efficiency : <br />0.830 <br />0.830 • <br />(1 sh1R/day) <br />Net correction : 0.830 0.830 <br />,. .: .., c:£ ,. <br />Z3-.~3G <br />
The URL can be used to link to this page
Your browser does not support the video tag.