My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE55912
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE55912
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:58:36 PM
Creation date
11/20/2007 4:49:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084A
IBM Index Class Name
Permit File
Doc Date
1/11/2005
Section_Exhibit Name
Exhibit 23 Bond Calculations
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sheet 1 of 2 <br /> CIRCES Cost Estimating Software <br /> TRUCK/LOADER TEAM WORK <br /> • <br />PROJECT IDENTIFICATION <br />Agency or organization name :Colorado Division O/Minerals And Geology <br />Task # : 030 State :Colorado PermiVjob # : C-96-084 <br />Date: 12/15"2004 County:Las Anlmas Abbreviation :none <br />User: JRS Site:Lorencito Canyon Mine Filename :C084-030 <br />Permit or other job action :Current Perm/11ed Estimate <br />Task description :Replace Top5011 from ; <br />BA#1 to C-2 <br />HOURLY EQUIPMENT COST <br />7 ruck/loatler team -Truck : Caf 7730 <br />-Loader : CAT gg0 Series ll <br />Suppod equipment -Load area : Cat D9R - 9SU <br />-Dump area : Cat D9R - 9SU <br />ad maintenance -Motor grader : CAT 14H <br />-W ater truck : Water Tanker, 5.000 Gal. <br />Shift basis : 1 per day <br />Cost Breaktlown : Truck/Loader Work Team <br />Truck Loading Tool Support Equipment <br />load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data flename: fruck2 loader dozer dozer grader misctruk <br />°~ Utilization-machine : 97 100 50 100 25 25 <br />-Ripper attachment : NA NA 50 0 NA NA <br />Ownership cosVhour: $58.05 $77.61 $51.01 $51.01 $34.94 $22.35 <br />Operating cosUhour: $72.51 $94.87 $46.77 $93.54 $10.60 $9.18 <br />Ripper op. cosVhour : NA NA $4.5i $0.00 $0.00 NA <br />Operator cosUhour : $21.80 $31.95 $31.76 $31.76 $31.95 $21.16 <br />Unit subtotals: $152.36 $204.42 $134.05 $176.31 $77.49 $52.69 <br />Number of units : 2 1 1 1 1 1 <br />Group subtotals : Work : $509.15 Support : $310.36 Maintenance : $130.18 <br />Total work team cosVhour : $949.69 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 5,590 CCY factor: 1.125 volume: 6.289 LCY <br />Material weight : 2,550 pounds/LCY Struck volume : 34.80 LCY <br />Descr.: Earth -dry packed Heaped volume : 46.40 LCY <br />Rated payloatl : 108,060 pounds Average volume : 40.60 LCY <br />Payload capacity : 42.38 LCY Adjusted volume': 42.38 LCY <br /> Final truck volume based on number of loader passes : 39.38 LCY <br /> ' Wck volume adlustatl to not exceetl rated payload or heaped volume <br />Loading Tool Caoacity • ob Contlition Corrections : Site altitude (ft.) : 7,100 <br />Rated capacity {nom. heaped) : 11.250 LCY Truck Loader Source <br />Descr.: Loose matedal - 1 "and over (85 - 90Y) Altitude adj.: 1.000 1.000 (Cat HB <br />Bucket fill factor : 0.875 Job efficiency : 0.830 0.830 (1 shiN/da. <br />Adjusted bucket capacity : 9.843 LCY Net correction : 0.830 0.630 <br />• <br />C J <br />~3-3y <br />
The URL can be used to link to this page
Your browser does not support the video tag.