My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE55912
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE55912
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:58:36 PM
Creation date
11/20/2007 4:49:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084A
IBM Index Class Name
Permit File
Doc Date
1/11/2005
Section_Exhibit Name
Exhibit 23 Bond Calculations
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br /> <br /> <br />PROJECT IDENTIFICATION <br /> Agency or organization name :Colorado Division 0/Minerals And Geology <br />Task # : 027 State :Colorado Permit/job # : C-96-084 <br />Date : 12/152004 County :Las Animas Abbreviation :none <br />User: JRS Site :Lorencito Canyon Mine Filename :C084-027 <br />Permit or other job action :Currant Permitted Estimate <br />Task description :Replace Topsoil from Sfockplle SSP#3 to Flll 8 <br />r <br />v.~a> .~ar .. >.... .. .,. .. ., .. ,: .:. <br />HOURLY EQUIPMENT COST Shift basis : 1 per day <br />team <br />Support equipment -Load area :Cat D9R - 95U <br />-Dump area:Cat D9R-9SU <br />Road maintenance -Motor grader :CAT 14H <br />-Water truck :Water Tanker. 5.000 Gal. <br />Cost Breakdown : Truck/Loader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 loader dozer dozer grader misctruk <br />°~ Utilization-machine : 100 94 50 - 100 25 25 <br />-Ripper attachment: NA NA 50 0 NA NA <br />Ownership cosUhour : $58.05 $77.61 $51.01 $51.01 $34.94 $22.35 <br />Operating cost/hour : $74.86 $88.95 $46.77 $93.54 $10.60 $9.18 <br />Ripper op. cost/hour: NA NA $4.51 $0.00 $0.00 NA <br />Operator cost/hour: $21.80 $31.95 $31.76 $31.76 $31.95 $21.16 <br />Unit subtotals: $154.71 $198.51 $134.05 $176.31 $77.49 $52.69 <br />Number of units : 2 1 1 1 1 1 <br />.Group subtotals : Work : $507.94 Support : $310.36 Maintenance : $130. f8 <br />Total work team wsUhour : $948.48 <br />Initial Swell Loose <br />volume: 8,820 CCY factor: 1.125 volume: 9,922 LCY <br />Source of quantity take-oH :Table 2.05.4-1 f <br />Source of estimated swell factor :CAT Handbook <br />Material purchase cost : $0.00 /LCY <br />Truck CaoaelN <br />Truck Payload (weight) Basis <br />Total cost <br />Truck Bed (volume) Basis <br />,i <br />`*?ii;, <br />Material weight : 2,550 pounds/LCY Struck volume <br />Descr.: Earth -dry packed Heaped volume <br />Rated payload : 108,060 pounds Average volume <br />Payload capacity : 42.38 LCY Adjusted volume': <br /> Final truck volume based on number of loader passes <br /> ' Wck vdume atljusled m MI exceed rated peyloetl or heaped volume <br />Loading Tool CaoaciN <br />Rated capacity (nom, heaped) : 11.250 LCY <br />Descr.: Loose matedel - 1 "end over (85 - 90% <br />Bucket fill factor : 0.875 <br />Adjusted bucket capacity : 9.843 LCY <br />Truck <br />Altitude adj.: 1.000 <br />Job efficiency : 0.830 <br />Net correction : 0.830 <br />$0 <br />34.80 LCY <br />46.40 LCY <br />40.60 LCY <br />42.38 LCY <br />39.38 LCY <br />r1 <br />U <br />C <br />Site altitude (ft.) : <br />Loader 7,100 <br />-Source <br />1.000 (Cat HB) <br /> <br />0.830 • <br />(1 shiWday) <br />0.830 <br />Z 3 ~- ZB <br />
The URL can be used to link to this page
Your browser does not support the video tag.