My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE55912
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE55912
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:58:36 PM
Creation date
11/20/2007 4:49:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084A
IBM Index Class Name
Permit File
Doc Date
1/11/2005
Section_Exhibit Name
Exhibit 23 Bond Calculations
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Filename : C084-000 County :Las Animas <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Permit or iob action :Current Permitted Estimate <br />ASK LIST (DIRECT COSTSI <br />NO. TASK DESCRIPTION FORM <br />USED FLEET <br />SIZE TASK <br />HOURS DIRECT <br />COST <br />OOa -Backfilling and Rough Grading Tasks -Tasks 001-004 summary2 1 2,320.9 $1,299,888 <br />006 Ripping Task -Task 008 summary2 1 6.9 $3,333 <br />OOc -Final Grading Tasks -Tasks 012-015 summary2 1 40.1 $4,385 <br />DOd Drainage Control System Removal Task -Task 020 summary2 1 8.5 $3, 867 <br />OOe Topsoil Replacement Tasks -Tasks 025059 summary2 1 219.0 $134,922 <br />OOf -Drill Hole and Monitoring Well Sealing Task -Task 065 summary2 1 180.0 $63,113 <br />OOg -Revegetation Tasks -Tasks 070-078 summary2 1 422.4 $218,985 <br />OOh -Miscellaneous Reclamation Tasks -Tasks 082-085 summary2 1 531.7 $155,277 <br />OOi Mobilize/Demobilize Equipment Tasks -Tasks 090-093 summary2 1 24.8 $50,351 <br /> <br />I • <br />• Includes tnnation factor aajusUnent of : NA °f° <br />SUBTOTALS: 3,754.70 $1,934,121 <br />TOTAL DIRECT COST' $1,934,121 <br />INDIRECT COSTS <br />ovEaNEAD AND PROFIT - Liability insurance : 1.55 % of direct total = $29,979 <br />Performance bond : 1.05 % of direct total = $20,308 <br />Job superintendent : 1877.35 hrs'...$/hr. $36.25 total = $68,054 <br />Profit : 10.00 % of direct total = $193,412 <br />'assume net hours = 50Ye of task Hours TOTAL O & P = $311, 753 <br />LEGAL-ENGINEERING•PROJEC7MANAGEMENT- CONTRACT AMOUNT(direcl+08P)= $2,245,874 <br />Financial warranty processing (legallrelated costs) : NA NA NA total = $0 <br />Engineering work and/or contracWid preparation : 4.25 %olcntr. NA total = $95,450 <br />Reclamation management and/or administration : 6.00 %olcntr. NA total = $134,752 <br />• <br />CONTINGENCY- NA' NA total = NA <br />'crontinBenGes accounted kr at task level TOTAL INDIRECT COST= $541,955 <br />TOTAL BOND AMOUNT (direct + indirect) = 52,476,076 <br />Z3~1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.