Laserfiche WebLink
BEAR COAL COMPANY Pepe 4 <br />• BOND COMPARISON - STRUCTURAL DEMOLITION <br />Subtotal Sheet 7 (99,971 <br />Less Salvepe Item Costs - Mote 4 ((58,053) <br />Plus Fecilitiea Salvage Avcrnpee 3-Contraetora (16,760 <br />Less Credit for Concrete Removsl Note 5 (f2[,2[3) <br />Net Structural Demolition Cost (37,465 <br />Notes: <br />SAL. In a letter fisted December 70, 7992, the Division agreed to allow the salvage value of certain structures <br />to offset the cost of removing the structure from the site. Three bids were received which established <br />the ael vape value to be used. See the follows np page for a simnery of the prices. <br />1. puentitiea of miscellaneous waste developed during DMG inpection an 2-23-93. <br />2. Fencing along flood control dike will be left in piece as pert of residential 1•~•' use. <br />3. Concrete berricadea will be left in place to provide stability during backfillr ~ crat iota. <br />4. Three new es[imstes, a faeili ty corditi on statement and a new UCC lien search wil, be <br />~~~mttted to the Division every 2 t/2 years, specifically, in the renewal applitetlon end 60 days <br />:.ion to the midterm review date. <br />~. The total estimated cost of concrete removal for the three structures, shop, warehouse /t end warehouse /2 <br />is (26,253. This onrant of money would allow a D-8 cat to operate for over 290 hours, 7 weeks, (26,253/90! <br />to remove the concrete. Since the concrete is to he disposed of on site as shown an Map 72, the level of <br />effort necessary to remove the concrete is drastically reduced. Allow 40 hours with a D-8 aise cat <br />for a total estimated cost of 53600 (40 Hrs. % f90). This will provide a crest to the estimated ctructural <br />demolition estimate of 522653 (f26253 - (3600). AlloN another eight hours to develop the waste disposal area end <br />eight hours to cover the baekfilled corcrete. This increases the cost by (1440 (16 hrs. % f90) and reduces <br />• the credit to (27273 (22653 - 1440). <br /> <br /> <br />