Laserfiche WebLink
9UARTERLY POND INSPECTION REPORT <br />(OPERATOR: BLUE RIBBON COAL CO. OUARTER:~FIRST QUARTER 1989 <br />i <br />(MINE: BLUE RIBBON MINE <br />I <br />DATE OF <br />INSPECTION: MARCH 22, 1989 ~ <br />I <br />(POND IDENTIFICATION <br />I <br />#3 <br />~4 <br />#5 <br />:TYPE OF POND <br />i SEDIMENT SEDIMENT SEDIMENT <br />!STATUS DURING INSPECTION: <br />APPROXIMATE WATER LEVEL DRY DRY FULL <br />ISED (~ total storage) 0~ O~ <10~ <br />(OUTFLOW (cfis) <br />i NONE NONE 0.0284 <br />(FEATURES PROBLEM COMMENTS <br />(EROSIONAL: <br />I YES NO <br />I <br />I Rills & Gullet's <br />I X <br />Inadequate Vegetation X <br /> <br />Outlet Channel Erosion <br />i <br />X <br />I <br />Burrows <br />X <br />~ Other X <br />(STRUCTURAL: <br />I <br />~ Dififierential Settling X <br />Cracks or Slides X <br />Seepage X 1 <br />Other X <br />APPURTENANT STRUCTURES: <br />Defective Spillways X <br />Dewater Device Clogged X <br />Faulty Gates, Etc. <br />I X <br />Other X <br />ADDITIONAL COMMENTS: <br />MAINTENANCE REBUIRED: <br />WATER LEVEL ABOUT 12" BELOW EMERGENCY SPILLWAY <br />OVERFLOW; OPENED DEWATERING DEVICE TO DEWATER POND. <br />NONE <br />NAME OF INSPECTOR: JIM STOVER <br />