Laserfiche WebLink
III IIIIIIIIIIIII III <br />998 <br />E~~A <br />S Coal Company <br />RECEIVED <br />JAN 0 71002 <br />Division of Minerals and GeoloAY <br />Mr. Michael Boulay <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203-2273 <br />Seneca Coal Company <br />December 21, 2001 <br />RE: Seneca II-W Mine (C-82-057) Quarterly Stockpond Inspections <br />Dear Mr. Boulay: <br />Enclosed are copies of the fourth quarter stockpond inspections <br />for those structures at Seneca II-W which have been constructed <br />to date. Inspections for Stockponds T-1, T-2, T-3, T-18, T-22 <br />and T-24 are included. <br />Should you have any questions, please do not hesitate to call. <br />Sincerely, <br />~'l.J <br />Dennis Jon s <br />Hydrologist I <br />Enclosure(s) <br />Seneca Coal Company • P.O. Drawer D • Hayden, Colorado 81639 <br />Telephone (303) 276-3707 • FAX (303) 276-3014 <br />