Laserfiche WebLink
1 <br /> <br /> MINING PLAN <br /> <br /> Mining will begin in the northwest corner of the pit <br /> area along the wash. Excavation will proceed southerly <br />' and easterly. Overburden does not exist at the starting <br /> point of excavation. It increases in depth .to the <br /> south and east to a depth of about 15 feet. when <br />th <br />f <br />h <br />d <br />d i <br />t <br />t <br />t <br />b <br /> e over <br />en encouptere <br />s grea <br />er <br />an <br />wo <br />ee <br />t <br />ur <br /> in depth it will be stripped and stockpiled along <br />' the south edge of the pit. Stripping will be done <br /> in stages to expose only the amount of gravel expected <br />' to be removed in a one year period. <br /> Gravel will be removed using front end loaders. <br /> Material will be loaded into trucks and hauled to <br />' construction projects. When gravel is to be crushed <br />h <br />k <br />d th <br />St <br />ill di <br />l <br />f <br /> er. <br />oc <br />e crus <br />the loaders w <br />rect <br />y <br />ee <br /> piles will be located in the excavated pit floor. <br /> Overburden in excess of that needed for reclamation <br /> will be removed for use in construction projects. <br />' <br /> A berm will be left between the adjacent properties <br />' on the north and west to screen the pit area. <br /> <br /> <br /> <br />LJ <br /> <br />