Laserfiche WebLink
~h <br />TYPE OR PRINT CLEARLY <br />14. Present land use ~~ ~ A ~ _ ~ e ~ <br />(i.e., agricultural, industrial, etc.) <br />-z- <br />15. Proposed future land use ~,,,..t_.-E~_.:~, ~;,(1n ~ Ln,/- ~,;,, <br />(Goal of reclamation) <br />INSTRUCTIONS: This application form must be submitted in duplicate $nd each form must <br />be accompanied by the following information and itemsl. The application <br />will not be processed until complete. See RULE 3 (fo~ Limited Impact) <br />or RULE 4 (for Special 10-day) for additional guidance. <br />EXHIBIT A - Legal Description <br />The legal description must identify the affected land and be wholly adequate for <br />field location of the property. It can be in the form of metesland bounds survey <br />or a description by reference to township, range, and section tQ at least the <br />nearest quarter quarter section. Where applicable, the street address or lot <br />number(s) may be used. <br />EXHIBIT B - :fining Plan <br />This can be a general discussion of the methods, equipment, pha es or stages of <br />the operation and those portions of land affected by each. The plan should be <br />closely correlated with the map and should show where extractio will begin, which <br />direction it will proceed. <br />EXHIBIT C - Mav <br />This map should be as comprehensive <br />the permit boundaries and indicatin <br />connection with the operation. All <br />The closest quarter section corner, <br />should also be shown on the map. <br />as possible in terms of clelrly defining <br />all roads or stockpile are s to be used in <br />immediately adjacent lando ers must be shown. <br />section line, or any other docateable point <br />I <br />EXHIBIT D - Wildlife Water Resources, Ve etation and Soils Information <br />Each of the above-mentioned subjects must be addressed as outli ed in the <br />applicable Rule, under item number ten (10). <br />EXHIBIT E - Reclamation Plan <br />As with the mining plan, this should be a general discussion of the methods, <br />equipment, phases or stages of the reclamation process and thos portions of <br />land affected by each. If possible, the plan should be closely correlated <br />with the map. If not, the narrative must be comprehensive enou h to draw an <br />accurate verbal picture of the expected physical appearance of the area after <br />completion of reclamation. <br />EXHIBIT F - Proof of Local Government Approval <br />This must be a letter from the local government specifying conf~irmance with <br />existing zoning regulations. <br />EXHIBIT G - Source of Legal Right to Enter ~ <br />This could be a copy of the lease, deed, abstract of title, or current tax <br />receipt. In lieu thereof, a statement acknowledged by a notar public that <br />the operator has the legal right to enter and mine will be acc pted. <br />**FOR SPECIAL 10-DAY PERMITS ONLY** <br />EXHIBIT H - Reclamation Costs <br />If the surety is requested to be less than $2500, the operator must submit <br />facts to support such request. Otherwise a surety of $2500 wild automatically <br />be set. <br />EXHIBIT I - Terms of Governmental Contract i <br />The operator must submit a copy o£ the contract or other proof that proves the <br />necessity of a special 10-day permit. The operator must also ubmit evidence <br />of the surety provided under the governmental contract, if it as required. <br />