Laserfiche WebLink
~- 99 <br />GRAND VALLEY COAL COMPANY First Quarter 1999 <br />WATER SAMPLING REPORT Sampled by: Mark Wayment <br />Date: 3!11/99 Meters Calibrated: Yes <br />Weather Conditions: Fairly dry, sunny day, some snow in shady areas. <br />Sampling Conditions: Wells bailed prior to sampling <br />SURFACE WATER <br />Sample <br />Point Time Temp (C) pH EC VO&G Flow <br />CFS <br />SW-1 10:30 a 6.5 8.6 3100 NONE 5.8 <br />SW-2 11:50 a DRY <br />SW-3 11:30 a DRY <br />SW-5 10:20 a DRY <br />SW-8 11:45 a 4.5 8.8 2800 NONE 5.6 <br />GROUNDWATER <br />Sample <br />Point Time Temp (C) pH EC SWL (feet) <br />GW-1 11:00 a 8.1 7.48 4500 7.10 <br />GW-3 11:25 a 11.9 7.30 4100 20.5 <br />GW-6 11:35 a DRY <br />Location of PointsNVells: <br />SW-1 -East Salt Creek above McClave <br />SW-2 - McClave Creek at culvert below mine <br />SW-3 -Munger Creek at haul road culvert below mine <br />SW-5 - McClave Creek above mine site at culvert inlet <br />SW-6 -Munger Creek below mine before North split <br />SW~ -East Satt Creek between Munger and McClave Creeks <br />SW-X - McClave Creek at confluence with East Salt Creek <br />GW-1 -Alluvium of East Salt Creek about 3 miles above McClave <br />GW-3 -Alluvium of East Salt Creek just below Munger Canyon <br />GW~ - In Munger Canyon at the permitted waste rock disposal area <br />