Laserfiche WebLink
<br />Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No. M-88-112 <br />January 2006 Monthly Report <br />Page 3 <br />Table 2 -January 2006 Tailing Disposal Area Piezometer Depth to Water <br />Measurements (continued) <br />Piezometer Date Depth to Water <br />feet Total Depth (ft) Volume of <br />Water ft <br />P12 1/31/06 D 41.71 0.45 <br />P13 1131/06 40.99 41.34 0.35 <br />P14 I/31/06 41.24 0.00 <br />P15 1/31!06 41.t0 0.00 <br />Table 3 below provides the calendar year 2006 sludge management for the San Luis site. <br />Table 3 -Water Treatment Plant Sludge Management Year to Bate. <br />Date Quantity Sludge Management <br />October 2005 Sludge pumped from Pond #3 to drying pad. <br />Should you have any questions or comments, please do not hesitate to contact either myself (719) <br />379-0798 or Mr. Bill Lyle (303) 324-2630 or (970) 325-4482. <br />ncerely, <br />ulio F. Madrid <br />Environmental Coordinator III <br />Cc: Bill Lyle <br />File <br />