Laserfiche WebLink
~, -~~~ <br />RECE!\PED <br />~FEB 17 2006 <br />BATTLE MOUNTAIN RESOURCES, INC. °i°'S'°" °' "1pe`a" °"" c"°i°ev <br />February 09, 2006 / <br />Mr. Allen Sorensen / <br />State of Colorado <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />Re: Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No. M-88-112 <br />/January 2006 Monthly Report <br />Deaz Mr. Sorensen: <br />The following summarizes monitoring and site activities at the Battle Mountain Resources Inc. <br />(BMRI), San Luis Project for the month of January 2006. <br />Surface and ground water monitoring and analysis were completed for all required sites during <br />the month per the terms and conditions of the TR-32 Quality Assurance and Quality Control <br />(QA/QC) plan. <br />Vacuum on the tailing lysimeters was verified on January 31t', no water was present for sampling <br />and subsequent analysis. <br />Depths to water were collected for the tailing impoundment main embankment piezometers and <br />the West Pit and tailings embankment monitoring wells were collected on January 31~'. January <br />tailing impoundment piezometer measurements identified these installations were either dry or <br />contained less than 12 inches of water as illustrated in Table 2. Tables 1 and 2 below identify the <br />depth to water measurements collected for each of the site monitoring wells, piezometers and <br />lysimeters as required by the terms and conditions of the TR-32 QA/QC plan. <br />The tailing impoundment collection pond underdrain flow was pumped intermittently during the <br />month to minimize the collection pond level. The leak detection system was measured on January <br />30th. The January tailings pond underdmin flow average was 41.38 gpm and a total of 960 gallons <br />of water was excavated from the leak detection system yielding a monthly average of 32 gpad. <br />During January, the West Pit water treatment plant operated efficiently discharging a total of <br />7,876,900 gallons (24.17acre-feet) of water to Rito Seco Creek and a total of 783,900 gallons <br />(2.41 acre-feet) of water was transferred from the water treatment plant to the tailings <br />impoundment. Seepage along Rito Seco Creek remained dry during the month. The monthly <br />precipitation accumulalion for January was .02" inches, with the lazgest accumulation occurring <br />on January, 1~ (0.02^). <br />~~ <br />P.O. Box 310 San Luis, Colorado 81152-0310 • (719) 379-0798 • Fax (719) 379-0713 <br />