Laserfiche WebLink
• Discharge flow basis for emergency spillway capacity evaluation (for a Class B pond): <br />• 100-yr, 6-hr peak flow + 0.72 (PMP, 6-hr peak flow - 100-yr, 6-hr peak flow) <br />• Discharge flow basis fox impoundment freeboard evaluation (for a Class B pond): <br />• 100-yr, 6-hr peak flow + 0.4 (PMP, 6-hr peak flow - ] 00-yr, 6-hr peak flow) <br />_ ~ -TABLE5 ~ ~ ~ - <br />IMPOUNDMENT HAZARD ANALYSIS SUINMARY~ <br />IMPOUNDMENT HAZARD SPILLWt\Y FREEBOARD <br /> CLASSIFICATION/BASIS CAPACI"rY EVALUATION <br /> EVALUATION BASIS'/RESULT/ <br /> BASIS'/RE:iULT FREEBOARD <br />Streeter Pond (001 A) B/Proximity to State Class B/pk Class B/Ok/0.25' <br /> Hi hwa 13 <br />Work Area Pond A/Agricultural Land Class B/Ok Class B/Ok/1,55' <br />1002A1 <br />Gossard Pond 1003A) A/A ricultural Land Class B/Ok Class B/Ok/6,46' <br />Gulch A Pond 1004A) A/Agricultural Land Class B/Ok Class B/Ok/0.16' <br />Stoker Siding Pond A/Agricultural Land Class B/Ok Class B/Ok/3.64' <br />1005A1 <br />Rail Loop Pond A/Agricultural Land Class BPJk Class B/Ok/1,82' <br />1006A1 <br />Prospect Pond 1007A) B/Proximity to State Class BPJk Class B/Ok/0.61' <br /> Hi hway 13 <br />West Pit Pond IOOSA) A/A ricultural Land Class B/Ok Class B/Ok/2.47' <br />Section 16 Pond B/Proximity to State Class B/Ok Class B/Ok/0.96' <br />1009A1 Highway 13 <br />East Taylor Pond A/Agricultural Land Class B/Ok Class B/Ok/0.76' <br />(010A) <br />Taylor Pump Holding A/Agricultural Land Class B/Ok Class B/Ok/0.91' <br />Pond <br />Notes: 'Spillway capacity and freeboard for all ponds were evaluated for a uniform worst-case <br />hazard classification (Class B) <br />The results of the WWC impoundment hazard analysis indicate that emergency spillway capacities and <br />available freeboard far all existing ponds are adequate to affect full compliance with applicable requirements <br />under the guidelines of TR-6Q, based on the applicable hazard classifications. Given this confirmation of <br />compliance, no modifications to the existing emergency spillway structures are required. <br />5.0 POND DESIGN EVALUATION RESULTS <br />The results of the pond design analyses are summarized in Table 6. The supporting SEDCAD4 analyses and <br />watershed maps are presented as attachments in each of the individual pond design sections <br />6.0 REFERENCES <br />Bufleld, Warner, & Haan (1981). "Applied Hydrology and Sedimeutolagy for Disturbed Area'. Oklahoma <br />Technical Press, Stillwater, OK. <br />Exhibit 7 6 Revision Date 10/23/03 <br />Revision No. TR-56 <br />