Laserfiche WebLink
PBRIODIC INSPECTION FORN <br />Stockponde or Bumps <br />INSPECTOR'S NAME: Rev Rare <br />FACILITY CONFIGURATION: ~^ e~ pond <br />SITE NAME: T-29 <br />MINE NAME: cane a rT <br />MINE I.D. NO.: c-BD-005 <br />DATE: 12/15/98 <br />DATE LAST INSPECTION: N/A <br />LOCATION: cW3rc_WS~ aec 1 TSN RB7W <br />LOCATION: 7.1 m± eF. of 8aydon, CO <br />OWNER'S REP.: Brad Brown Gen Myr <br />1. Angle of elope: v:~ upstream, a_1 downstream Total = 7:1 N/A <br />2. •Seepage (specify location, color, and approximate volume) <br /> <br /> At isolated points on embankment elopes: Yee ~ N/A <br /> At natural hillside: Yee N® N/A <br /> Over widespread areas: Yee ~ N/A <br /> From downstream foundation area: Yee ~ N/A <br /> "Boils" beneath stream or ponded water: Yes ~ N/A <br />3. Cracks or scarps on treat: Yee ©o N/A <br />4. Cracks or scarps on elope: Yea ~ N/A <br />5. Sloughing or bulging on elope: Yes !!l---~~ N/A <br />6. "Major erosion problems: Yee ~ <br />o N/A <br />7. Surface movements in valley bottom or on hillside: Yee ~ N/A <br />B. *Eroeion of toe: Yee ~~~ <br />~ N/A <br />9. •Water impounded against downstream toe: Yee N N/A <br />10. Existing embankment freeboard: Aznproximately ~ feet <br />11. Increase Decrease in water level: feet <br />12. cracks, bulging, or erosion on upstream face: Yee ® N/A <br />13. Spillway erosion: Yee No N/A <br />14. *Clogging <br /> Spillway channels: Yee N/A <br /> Diversion ditches: Yes No N/A <br />•Major adverse changes in these items could cause instability and should be reported to <br />the Engineering Manager and Mine Superintendent for further evaluation. Adverse <br />conditions noted in these items should normally be described (extent, location, volume, <br />etc.) in the apace on the back of this sheet. <br />