My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO24416
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO24416
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:44:29 PM
Creation date
11/20/2007 4:40:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
Hydrology
Doc Date
1/14/1999
Doc Name
4th Qtr 1998 Inspections
From
SENECA COAL CO
To
DMG
Permit Index Doc Type
SEDIMENT POND INSPECTIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PERIODIC INSPECTION PORM <br />Stockpoada or Sumps <br />INSPECTOR'S NAME: Aoy Karo <br />FACILITY CONFIGURATION: Stoc cnnnd <br />SITE NAME: T-20 <br />MINE NAME: Seneca ii <br />MINE I.D. NO.: c-80-005 <br />DATE: t2/t 5/98 <br />DATE LAST INSPECTION: 09~,Z$/98 <br />LOCATION: _.S_F~~~f~ ~ 1 TSN A87W <br />LOCATION: 7.t mi SF. of Hayden CO <br />OWNER'S REP.: Arad Aroma, C-en Mq~_ <br />1. Angle of elope: ~:t upstream, a:1 downstream <br />2. *Seepage (specify location, color, and approximate volume) <br />At isolated points on embankment elopes: <br />At natural hillside: <br />Over widespread areas: <br />From downstream foundation area: <br />"Boils" beneath stream or ponded water: <br />3. Cracks or scarps on treat: <br />4. <br />5. <br />6. <br />7. <br />8. <br />Cracks or scarps on elope: <br />Sloughing or bulging on elope: <br />*Major erosion problems: <br />Surface movements in valley bottom or on hillside: <br />*Erosion of toe: <br />9. *Water impounded against downstream toe: <br />10. Existing embankment freeboard: an„oroximately <br />11. increase Decrease in water level: No change <br />12. Cracks, bulging, or erosion on upstream face: <br />13. Spillway erosion: _ <br />14. *Clogging <br />Spillway channels: <br />Diversion ditches: <br />Yee ® N/A <br />Yes ~ N/A <br />Yee N® N/A <br />Yes ®o N/A <br />Yee No N/A <br />Yee ~ N/A <br />Yes ~ N/A <br />Yee ~ N/A <br />Yee ~ N/A <br />_~ feet <br /> feet <br />Yes No N/A <br />Yee ~N N/A <br />Yee N/A <br />Yea o N/A <br />*Major adverse changes in these items could cause instability and should be reported to <br />the Engineering Manager and Mine Superintendent for further evaluation. Adverse <br />conditions noted in these items should normally be described (extent, location, volume, <br />etc.) in the apace on the back of this sheet. <br />Total = 7:7 N/A <br />Yea ® N/A <br />Yes ©o N/A <br />Yee ® N/A <br />
The URL can be used to link to this page
Your browser does not support the video tag.