Laserfiche WebLink
PERIODIC INSPECTION PORN <br />Stoekponde or Sumps <br />INSPECTOR'S NAME: Rey Rare <br />FACILITY CONFIGURATION: Stoc pond <br />SITE NAME: T-16 <br />MINE NAME: c n a rS <br />MINE I.D. NO.: C-80-005 <br />DATE: 1$,/15/98 <br />DATE LAST INSPECTION: 09/28/9R <br />LOCATION: SE'kNW'k c~ TSN. RB7w <br />LOCATION: 7.1 mi_ SE of Hayden CO <br />OWNER'S REP.: Rrad Rrewn Can MqL_ <br />1. Anqle of elope: 3:1 upstream, 3:1 downstream Total = 6:1 N/A <br />2. *Seepage (specify location, color, and approximate volume) <br /> At isolated points on embankment elopes: Yee ~ o N/A <br /> At natural hillside: Yee No N/A <br /> Over widespread areas: Yee Q N/A <br /> From downstream foundation area: Yes No N/A <br /> "Boils" beneath stream or ponded water: Yes ©o N/A <br />3. Cracks or scarps on treat: Yee ~ N/A <br />4. Cracks or scarps on elope: Yee ~ N/A <br />5. Sloughing or bulging on elope: Yes ~ N/A <br />6. *Major erosion problems: Yee ®o N/A <br />7. Surface movements in valley bottom or on hillside: Yes ~ N/A <br />8. •Eroeion of toe: Yee ~ N/A <br />9. *Water impounded against downstream toe: Yee ~ N/A <br />10. Existing embankment freeboard: Appfox'ma ly 8.5 feet <br />11. Increase Decrease in water level: No charge feet <br />12. Cracks, bulging, or erosion on upstream face: Yes ~ N/A <br />13. Spillway erosion: Yee ~ N/A <br />14. *Clogging <br /> Spillway channels: Yee ~q N/A <br /> Diversion ditches: Yee o N/A <br />*Major adverse changes in these items could cause instability and should be reported to <br />the Engineering Manager and Mine Superintendent for further evaluation. Adverse <br />conditions noted in these items should normally be described (extent, location, volume, <br />etc.) in the apace on the back of this sheet. <br />