Laserfiche WebLink
QUARTERLY POND INSPECTION REPORT <br />Bowie Resources Limited Quarter: <br />Bowie No. 2 Mine - C-96-083 Inspection <br />Identification <br />of Pond <br />s During Inspection: <br />iximate Water Level <br />gent (% total storage) <br />iw (cfs) <br />Rills & Gulleys <br />Inadequate Vegetation <br />Outlet Channel Erosion <br />Burrows <br />Other <br />D'rfferential Settling <br />Cracks or Slides <br />Seepage <br />Appurtenant Structures <br />Detective Spillways <br />Dewatering Devices Clogged <br />Faulty Gates, Etc. <br />Comments <br />Maintenance Required: <br />Name of Inspector; Jlm Stover <br />B C D -Gob Pile J UTL East K UTL West <br />Sediment Sediment Sediment Sediment Sediment <br />6' 4.25' 3.7' D D <br />50% 0% 33% 0% 10% <br />0 0 0 0 0 <br />No No No No No <br />No No No Yes Yes <br />No I No I No I No ! No <br />No <br />No <br />No <br />No No No No No <br />The water in Ponds B, C 8 D was above the level of the primary spillway. <br />Pond J & K lack good vegetative cover <br />Design depth measured from pond bottom to invert of emergency spillway: <br />Pond B=10, 0=7.25, D=7.7, J=6, K=4 <br />~~PpO RfG•~sl~ <br />Dewater Ponds B, C and D. ~~~~~ F.S E `yTp•.~f a <br />~` G <br />i ~r •~ 19 38 ~•; it i~~ ~~ <br />Date <br />