Laserfiche WebLink
<br />PACE 2 <br />3. Will the permittee continue to have a discharge point, such as pipe, <br />conduit, unlined lagoon, etc? 3EU'ir7E.tJ(' '~u''uv `"~~~ ~ Yes ^ No <br />y~tMAG~/ / sc-~a~oa~LY sPiu ~NtY.S.> <br />4. Under what conditions could a di/sc~harge occur: Storm (low, change in operation, <br />accidental spill, etc. S~sar~ { luu7 ~ IRCtG~AT~Di.I tJA'[G2.. <br />5. If this is a mining facility or operation, indicate whether any mine <br />drainage exists. Discuss whUher there has been a historical flow. , <br />MO M11J6 ~(LAII~1ACa~C.o <br />6. Is there a downstream water user, water supply intake, etc.? ~ Yes ^ No <br />ff `` i <br />a. If yes, whom and where? CArLbv~t ~~ritk. r /t:co ~/S .Si:,Di~1Wr r7JD <br />b. Could they be impacted by a discharge or a spilt of <br />any pollutant on-site controllable under an SPCC Plan <br />o~~r//other condition o/f a permit? ^ Yes ® No <br />NU ~0//u~><H~I~fS D~-S /~~, /3~/ww i,~ ~2GG~N~rrlEp„ <br />NOTE: THE FOLLOWING SHOULD BE I~PT IN MIND TF YOUR PERMTT iS TERMINATED: <br />1. The permittee will still be responsible and subject.to any enforcement action for any discharge or spills info state waters. <br />Should you operate your facility after your permit has been terminated aad a discharge could occur, you must apply for a <br />new permit no lass than I80 days prior to the discharge. It is unlawful to discharge pollutants from a point source to state <br />waters without a permit. Section ?S-Sfi08 of the Water Quality Control Act provides for assessing civil penalties of up to <br />510,000 per day for unlawful discharges. <br />2. la general the continued existence of a discharge point will be the basis for not terminating a permit at the request of the <br />permittee. <br />I certify under penalty of few that I have personally examined and am familiar with the information submitted herein and based <br />oa my inquiry of those individuals immediately responsible for obuining the information. I am aware that there are significant <br />penalties for submitting false information including the possibility of fine and imprisonment. See 1 B U.S.C. 1001 and 33 U.S.C. <br />1319. <br />~~~~ ~~~~ ~-3-vim <br />A oriud Representative Date <br />Based upon my verification of the above information obtained during my site inspection, it is my recommendation that this permit <br />be terminated. <br />District Engineer <br />Date <br />^ Yes ^ No <br />