Laserfiche WebLink
Ms. Michelle Austin .Page 4 <br />G.L. Substitute Water Supply Plan (DMG# M-80-022) <br />March 14, 2005 <br />Table I <br />G.L. Pit (DMG # M-81-022) <br />MONTHLY DISTRIBUTION FOR DEPLETION & REPLACEMENT REQUIREMENTS <br />(All Values in Acre-Feet) <br /> Lagged Transit Total <br /> Evaporative losses Replacement Actual timing of <br />Month Depletions <br />including post- from Requirement Replacement from <br /> Eaton from Tri-Districts Sand Creek <br /> pumping Reservoir lease <br /> de letions <br />Nov-04 0.77 0.06 0.83 <br />Dec-04 0.62 0.05 0.67 <br />lan-05 0.73 0.06 0'78 <br />Febr-OS 0.66 0.05 0.71 <br />P~tar-05 0.62 0.05 0.67 <br />A r-05 0.68 0.05 0.73 4.4 <br />Ma -O5 0.78 0.06 0.84 0 8 <br />Jun-05 1.02 0.08 1.10 1.1 <br />Jul-OS 1.28 0.10 1.38 1.4 <br />Au -05 1.35 0.11 1.45 1.5 <br />Se t-OS 1.22 0.10 1.32 1.3 <br />Oct-O5 0.99 0.08 1'07 1.1 <br />Total 10.7 0.8 11.5 11.5 <br />Note: The transbasin Sand Creek Ditch water is transported over Boulder Ridge in the Wilson <br />Ditch and Stored in Eaton Reservoir. Releases made from Eaton Reservoir travel <br />approximately 50 niiie~ to the mouth of the Poudre Canyon, therefore a 7.8 transit loss was <br />included in the total replacement water. <br />