My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO24360
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO24360
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:44:27 PM
Creation date
11/20/2007 4:37:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Hydrology
Doc Date
2/6/1998
Doc Name
COLOWYO COAL CO LP ANNUAL STORM WATER REPORT FACILITY ID COG-850017
From
KENNECOTT ENERGY COLOWYO COAL CO LP
To
WQCD
Permit Index Doc Type
OTHER GROUND WATER
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STORM~'ATER ANNiJAL REPORT -COAL <br />COLORADO DEPT. OF PUBLIC; HEALTH & ENVIRONMENT <br />Water Quality Control Division <br />WQCD-PE-B2 <br />4300 Cherry Creek Drive South <br />Denver, Colorado 80222-1530 <br />Please print or type. FiU in each section. <br />Permittee (Company Name): colowyo Coal Company L.P. <br />Facillty Name: Colowvo Mine <br />Facility AddreSS: 5731 State NiQhwav 13 <br />Meeker, CO. 81641 <br />Facility Phone Number: (970 ) 824-4451 <br />Permit Certification No. COG-850 ~ ~.., ~ <br />Reporting Period: Jan. 1-Dec. 31, 19 9 7 <br />FOR AGENCY USE ONLY . <br />.. ......... . <br />Date Received <br />.. <br />::;:.'.bay.':.. <br />Xear:' :: Month..:. <br />A. A report on the facility's overall compliance with the SA'MP. (Include here a summary of any measures <br />taken to comply with your Stormwater Management Plan (SWMP}, to fully implement it, changes or <br />improvements made in any of your Best Management Practices (BMPs), problems encountered, spills, <br />other potential violations, etc.) <br />Inspections of all areas show compliance with the plan. <br />Were changes made to your SWMP? ^ No ^ Yes -Describe changes on a separate sheet. <br />B. A stuntnary of each comprehensive stotmwater facility ttupection trade, including date, ftttdings, and <br />action taken. (The permit requires at least two comprehensive facility inspections per year -see page 10 <br />of the permit. Include here a summary of those inspections, plus any other comprehensive inspections <br />made. It is not necessary w summarize day-today inspections, unless significant problems were noted.) <br />First Inspection -Date L/~/~. Findings, and action taken: <br />Inspections show compliance with the plan Partial ;n Aprr' c are perform d~- <br />part of the monthly Department of Mi nera7c and ('ent ng3. f• t~ ~ p r•pgf <br />Deficiencies are do ,menterl ,i r~. t t a ~ rh f f,.,.~,..,~_ <br />'Note -form may be reproduced Page 1 of 2 at t/94ci <br />
The URL can be used to link to this page
Your browser does not support the video tag.