Laserfiche WebLink
Changes Made to Stormwater Management Plan <br />An amended SWMP report was prepared and is included with this Stormwater Annual Report. <br />Changes made include: Modifications to the effluent limitations and monitoring requirements <br />to reflect post-mining outfall(s); and the inclusion of a Stormwater Management Plan <br />Certification. <br />