Laserfiche WebLink
<br />NUMBER FIGURE INDE% lcont'd) <br />NAME <br /> 2.04.7(2)(b)-1 Sample #1-Water Analysis-9/20/79 <br /> 2.04.712)(b)-2 Sample #2-water Analysis-9/21/79 <br /> 2.04.7(2)(b)-3 Sample #3-Water Analysis-9/21/79 <br /> 2.04,7(2)(b)-4 Sample #4-Water Analysis-9/20/79 <br /> 2.04.7(2)(b)-5 Sample #5-Water Analysis-9/20/79 <br /> 2.04,7(2)(b)-& Ditch Water Samples Analysis-12/16/80 <br /> 2.04,7(2)lb)-6a Water Analysis of Sample Sites A, B, C, and D <br /> present Monitoriru~, 7/29/81 <br /> 2.04.7(2)(b)-7 NPDFS Permit <br /> 2.04.7(2)(b1-8 NPDES Permit Deleted 12/22/88 <br /> 2.04,7(2>(b)-9 NPDES Permit Deleted 12/22/88 <br /> 2.04.9(1)(a)-1 Letter from U,S. Department of Agriculture <br /> 2.04,911)(d)-1 CSU Soil Evaluation Letter <br /> 2.04.11(1)-1 Impact of Mining on Wildlife <br /> 2.04.11(1)-2 Consultation crith Division of Wildlife <br /> 2.05.3(3)(b)(vi)(A)-1 Fan Noise Correspondence, 6/23/81 <br /> 2.05.3(3)(b}(vi)(C)-la-c DMEA Letter on ~++~~ssion Line <br /> 2.05.3(3)(b)(vi)(c)-2a-b Westhill Consultants Letter on Distribution Line <br /> 2.05.3(4)(a)-1 Sediment Control System Approved in Permit #77-232 <br /> 2.05.3(4)(a)(ii)-1 Proposed Sedimentation Pond Capacity Deleted 6/16/88 <br /> 2.05.3(4)(b)-1 Proposed Sedimentation Pond Calculations <br /> Deleted 6/16/88 <br />~. 2.05.3(4)(b)-2 Pond Size Verification Deleted 6/16/88 <br /> 2.05.3(4)(b)-3 Principal Spillway Calculations Deleted 6/16/88 <br /> 2.05.3(4)(b)-4 Proposed Sedimentation Pond Dewatering Device <br /> Calculation Deleted 6/16/88 <br /> 2.05.3(4)(bl-5 Proposed Sedimentation Pond Emergency Spillway <br /> Calculation Deleted 6/16/88 <br /> 2.05.3(4)(b)-6 Explanation of Calculations Deleted 6/16/88 <br /> 2.05.314)(d)-1 Culvert C Specifications Deleted 6/16/88 <br /> 2.05.3(6)(c)-1 Location of Test Holes by Fox Consulting Engineers <br /> 2.05.3(6)lc)-2 Logs on Test Holes by Fox Consulting Engineers <br /> 2.05.3(6)(c)-3 Logs on Test Holes by Fox Consulting Engineers <br /> 2.05.3(6)(c)-4 Logs on Test Holes by Fox Consulting Engineers <br /> 2.05,3(6)(c)-5 Logs on Test Holes by Fox Consulting Engineers <br /> 2.05.3(7)-1- Pond Approval Letter, Delta Site Deleted 6/16/88 <br /> 2.05.4(2)le)lvi)-1 Sampling Adequacy Test <br /> 2.05.6(1)(a)-1 Final A~roval Emission Permit <br /> 2.05.6(1)(a)-2 Initial Approval Emission Permit <br /> 2.05.6(6)(f)(ii)(A)-1 Pillar Stability Calculations-0vert/Duvall <br /> 2.05.6(6)(f)(ii)(A)-2 Pillar Stability Analysis of Superimposed Seams <br /> 2.05.6(6)(f)(ii)(A)-3 Pillar Stability Calculations-Wilson <br /> 2.07.6(21(d)(iv)(A) Approval Letter from Delta County~Commissioners <br /> 4.07,3-1 Drill Hole Information, New 5/27/91 <br /> 4.07.3-2 Drill Hole Information, New 5/17/91 <br /> 4.07.3-3 Drill Hole Information, New 5/17/91 <br /> 4.07.3-4 Drill Hole Information, New 5/17/91 <br /> <br /> Revised May 17,1991 <br />