Laserfiche WebLink
Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No. M-88-112 <br />August 2004 Monthly Report <br />Page 3 <br />Table 2 -August 2004 Tailing Disposal Area Piezometer Depth to Water <br />Measurements <br />Piezometer Date Depth to Water <br />feet Total Depth (ft) Volume of <br />Water ft <br />P6 8/31/04 D 72.46 0.00 <br />P7 8/31104 D 42.50 0.00 <br />P8 8/31/04 96.73 97.51 0.78 <br />P9 8/31/04 71.71 72.30 0.59 <br />P10 8/31/04 57.43 58.30 0.87 <br />Pll 8/31/04 41.28 41.80 0.52 <br />P12 8/31/04 41.66 41.71 0.05 <br />P13 8/31/04 41.00 41.34 0.34 <br />P14 8/31/04 D 41.24 0.00 <br />P15 8/31/04 D 41.10 0.00 <br />Clean-up at the San Luis Mill facility continued during the month. <br />87.5 tons of sludge was managed during the month, sludge was transferred from WTP <br />containment azea to a designated location at the tailings impoundment. <br />Should you have any questions or comments, please do not hesitate to contact either myself (719) <br />379-0799 or Mr. Bill Lyle (303) 324-2630 or (970) 325-4482. <br />'ncerely, ~ <br />l~ I <br />ulio F. Madrid <br />Environmental Coordinator III <br />Cc: Bill Lyle <br />file <br />