Laserfiche WebLink
Table 2 Monthly monitoring data April 7999 <br />ID Measurement Date Results <br />Trench Inlet Water sample 4/1/99 See attached analytical results <br />Trench Inlet Flow rate 4/1 /99-4/30/99 25 gpm prior to valve closure, <br />no flow the remainder of the month <br />SP-1 Water level Not measured No flow to trench <br />SP-2 Water level Not measured No flow [o trench <br />VP-1 Water level Not measured No flow to trench <br />VP-2 Water level Not measured No flow to trench <br />APP Pressure 4/1/99-4/30/99 See attached Table 3 <br />Visual 1 Visual 4/1/99-4/30/99 See attached Table 3 <br />Visual 2 Visual 4/1/99-4/30/99 See attached Table 3 <br />Visual 3 Visual 4/1/99-4/30/99 See attached Table 3 <br />WGL Weir Flow rate 4/1 /99 Flow = 70 gpm <br />Continuous recorder installed 4/7/99 <br />WGL Weir Water sample 4/1/99 See attached analytical results <br />DT-1 Water sample 4/1/99 See attached analytical results <br />DT-2 Water sample Not measured No flow <br />Creede <br />Formation Well Water level 4/1/99-4/30/99 See attached Fi ure 1 <br />9 <br />Received <br />MAY 2 01998 <br />p~~u c ~~r~ a Gep °9Y <br />