Laserfiche WebLink
State Req. <br />I <br />• 4.05.9(7) Both impoundments are certified by a registered professional engineer. <br />Refer to Exhibit 7-8 and 7-1 I of Permit C-005-80. <br />4.05.9(10) Peabody Coal Company makes quarterly inspections of both impoundments <br />for structural integrity. Inspection reports are submitted to the CM1_i: <br />Division. <br />• <br />• <br />7-10-15 Revised September 28, 1~~4 <br />