My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-12-11_PERMIT FILE - C1981014A (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981014
>
2001-12-11_PERMIT FILE - C1981014A (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2017 8:47:06 AM
Creation date
11/20/2007 4:36:12 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
NPDES PERMIT COR-040183 (MINE SITE)
Section_Exhibit Name
EXHIBIT 04 Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COLORADO DEPARTMENT OF PUBL/C HEALTH & ENVIRONMEM -Water Quality Control Division <br />Rationale -Page 9 Permit No. COR-040000 <br />V!. TERMS AND CONDlTlONS OF PERMIT (core.) <br />f • G. Annual Fee <br />All permittees are required to pay the annual permit administration fee, as described in the Colorado Water Quality <br />Control Act. (See Part II.B.10 of the permit.) As of February, 1996, the fee is $300 per year jot active mines that <br />are 10 acres or greater, $100 per year jot active mines that are less than 10 acres, and $50 per year jot inactive <br />mines. These fees are subject to legislative change. <br />H. Termination of Permit Certification <br />When a si[e has been reclaimed in accordance with the Colorado Division of Minerals and Geology (CDMG) <br />requirements and the site has been released from State reclamation requirements, the operator of the jaciliry may <br />request termiwtion. The requirements for termination are described in Pan I.F of the permit. <br />In the case where the site has no CDMG permit, certification under this permit may be terminated once raw <br />material, intermediate products, byproducts, finished products or waste products have been removed or isolated <br />from stormwater and the site has been stabilized (with little evidence of soil erosion or other runoff problem) and <br />revegetated. Specific criteria are listed in Part I.F. of the permit. <br />Continued coverage may be required after reclamation or remediation is complete if the Division has shown or has <br />reason to suspect that the stormwater discharge contributes to a violation of a water quality standard. <br />I. Duration of Permit <br />Zhe general permit shall not exceed five years in duration. /n this case the expiration date is set for September 30, <br />2001. The permittee's authority to discharge under this permit is approved umil the expiration date of the general <br />permit. Airy permittee desiring continued coverage under the general permit must apply for recertification under <br />,~ = • the genera! permit at least 90 days prior to its expiration date. <br />Sarah Johnson <br />February 26, 1996 <br />Vll. CHANGES AFTER PUBL/C NOTICE <br />A. Chances made by the Division <br />A few minor changes were made to the permit and rationale in response to imerna! Division review and comment to <br />improve program consistency and clarity. Other minor changes (typographical, etc.) were also made. <br />B. Response to Public Comments <br />Ihirteen letters were received during the public commem period for these permits. Many of the comments were <br />similar in nature and have been addressed as groups below. <br />1. Voluntary third parri mine-waste cleanup initiatives. <br />One group of commentors objected that the draft permit does not accommodate a voluntary watershed <br />remediation approach. /n general, they felt that as currently written, the permit severely limits the possibility <br />of vo[uruary cleanup initiatives. They suggested that perhaps a separate general permit would be more <br />appropriate, or at least the permit should clearly differentiate and separate the requirements and <br />!_ • responsibilities of third patty groups. Specifically, they noted that voluntary groups are not legal entities <br />which can hold permits. Funher, the permit does pat accommodate a watershed approach but rather <br />prescribes asite-by-site treatment. They proposed that the permit should provide liability protection for third <br />
The URL can be used to link to this page
Your browser does not support the video tag.