Laserfiche WebLink
Mr. Peter <br />Page 4 <br />September <br />V. O'C nor <br />23, 1985 <br />189,350 cubic feet of underground storage area with a capacity of <br />1,416,000 gallons of water. <br />A wall rock sample of Boulder Creek granite was taken from the <br />face of the Time mine near the Wynone winze. It has been <br />delivered to the Hazen Research Laboratory in Golden; Colorado, <br />and a total chemical analysis is being performed to determine pos- <br />sible contamination. As soon as the results from this sample ere <br />obtained, a copy will be forwarded to the Mined Land Reclamation <br />Division. The following averaged chemical compositions of Boulder <br />Creek granite were taken from data published by the U.S. Geo- <br />logical Survey. <br />SiO2 - 66.0% Na2O - 3.3% <br />A12O3 - 16.0% K2O - 2.5% <br />Fe2O3 - 1.9% MnO - 0.1% <br />FeO - 2.0% H2O - 0.7% <br />MgO - 1.4% TiO2 - 0.7% <br />CaO - 4.8% P2O5 - 0.8% <br />These are averaged analyses of 7 samples that were grouped to <br />facilitate compositional variations within the Boulder Creek granite <br />near Gold Hill, Colorado. <br />3. A sample o[ the water flowing in Lett Hand Creek was taken from <br />the creek near where the pump will be situated. It was delivered to <br />the Hazen Research Laboratory in Golden, Colorado, and an analy- <br />sis of the water is being performed. The Gold Hill Ventures Limited <br />Partnership has discussed water monitoring methods with the Lett <br />Hand Ditch Company, end plans to sample the creek above and <br />below the point of diversion. <br />4. Gold HiH Ventures intends to draw water from a point of diversion <br />located on the south bank o[ Left Hand Creek. The pumping station <br />will occupy a 15 by 20 toot frame building, near a site with an <br />existing access road and power source. Water will be pumped 3,900 <br />feet up Akins Gulch in a 2 inch diameter pipeline that will be <br />placed on the surface of the ground on the east side of an existing <br />mine access road. The water line will follow this road until it <br />reaches a point beneath the Gold Ring mine dump, where it will run <br />directly uphill to the Time mine's portal. The total amount of )and <br />surface that will be affected by the construction of the pumping <br />station is 0.013 acres. As we discussed at our meeting on September <br />18, 1985, the pipeline will not be buried, and its assembly will not <br />disturb the lend surface. We ere en ng topographic map <br />showing the location of the pumping tion, and a are increasing <br />the total acreage of affected land to 7.638 ecr s to encompass <br />this additional area within the permi boundary (Se Map B3). <br />