My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE55458
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE55458
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:58:17 PM
Creation date
11/20/2007 4:34:51 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
EXHIBIT 22 STORMWATER MANAGEMENT PLAN NEW ELK MINE
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />n <br />U <br />• <br />Smnmca~~r l)onag~mrnt Pfan <br />w. portal reclaimed substation ,erosion low. The site is inactive <br />and has been reclaimed <br />and mulched <br />c. Preventive Maintenance <br />All stormwater control systems (ditches, culverts, berms, revegetated areas, graveled areas, <br />etc.) are inspected at least twice a year, once in the spring and once in the fall, by the <br />Environmental Engineer. Inspection reports are to identify any work required to maintain <br />and preserve the integrity and service capacities of the stormwater control system. A <br />schedule of preventive maintenance activities is: <br />DEFICIENCY j SCHEDULE OF CORRECTIVE ACTION <br />Items that reduce the efficiency of the ~ Corrected within two weeks of discovery <br />system <br />(debris in ditches, culverts, etc.) <br />Deterioration of system components Areas to be re-gravelled: six months <br /> Areas to be re-seeded: next optimum plant- <br /> ing season <br />Failure of system components (wash- Temporary action to arrest progressive ero- <br />outs, etc), or development of new point sion within one week of discovery. Perma- <br />erosion sources nent corrective action to be identified within <br /> one week, necessary supplies ordered within <br /> two weeks, and restoration work scheduled <br /> within four weeks of materials availability <br />d. Good Housekeeping <br />The mine premises are to be kept clean and orderly, and is a general responsibility of the <br />Surface Facilities Forman. There are varying levels of activity at the exemption sites, and <br />waste, trash and rubbish is brought to collection containers within the operational permitted <br />facilities as it might be generated. <br />e. Spill Prevention Response Procedures <br />The Corporate Spill Prevention Plan is in effect at the facility (a part of Permit C81-012), <br />and by reference, part of this SWMP. This plan is made available to appropriate personnel. <br />Page 5 of 7 Pages <br />
The URL can be used to link to this page
Your browser does not support the video tag.